
Maintenance
6
Maintenance as required
Maintaining hydraulic equipment
WARNING
Hydraulic oils are hazardous to your health and are
under pressure during operation.
Note safety regulations for working with hydraulic
oils; see ⇒ Chapter "Hydraulic fluid", P. 3-33.
7071_003-072
1
Check hydraulic oil level
– Position truck horizontally.
– Tilt lift mast forward.
– Lower forks; if there are attachments (spe-
cial equipment), retract the working cylin-
der.
– Switch off the engine.
– Open the bonnet; see ⇒ Chapter "Opening
the bonnet", P. 5-55.
– Disassemble base plate; see ⇒ Chap-
ter "Installing and removing the floor-
– Unscrew (1) the dipstick and pull it out.
7094_700-002
1
2
– Check oil level. The oil level must be at least
up to the mark (2) on the dipstick.
– If the oil level is not up to the required level,
the hydraulic oil must be topped up ac-
cording to the maintenance data table
(see ⇒ Chapter "Maintenance data ta-
ble", P. 6-186) using the filler neck until
the mark is reached.
– Reinsert (1) the dipstick and tighten it.
Checking hydraulic equipment for leaks
– Check pipe and hose screw connections for
leaks (traces of oil).
Hose lines must replaced if:
• the outer layer is damaged or embrittled
with cracks
• they are leaking
• Unnatural deformations (e.g. bubble forma-
tion or buckling
• fitting is detached from hose
• heavy damage to or corrosion of the fitting
171673 [EN]
207
Содержание R70-40T
Страница 1: ...Operating Instructions LPG forklift truck R70 40T R70 45T R70 50T 7081 7082 7083 Ident no 171673 EN ...
Страница 2: ......
Страница 11: ...1 Foreword ...
Страница 18: ...1 Foreword Environmental considerations 8 171673 EN ...
Страница 19: ...2 Introduction ...
Страница 25: ...Introduction 2 Residual risk 171673 EN 15 ...
Страница 29: ...3 Safety ...
Страница 49: ...4 Overviews ...
Страница 51: ...Overviews 4 General view 171673 EN 41 ...
Страница 63: ...5 Operation ...
Страница 186: ...5 Operation Shut down 176 171673 EN ...
Страница 187: ...6 Maintenance ...
Страница 248: ...6 Maintenance 3000 hour maintenance two year maintenance 238 171673 EN ...
Страница 257: ...7 Technical data ...
Страница 265: ...8 Circuit diagrams ...
Страница 266: ...8 Circuit diagrams Hydraulics Hydraulics Hydraulic circuit diagram 7071_003 083 256 171673 EN ...
Страница 280: ...8 Circuit diagrams Electrical equipment 270 171673 EN ...
Страница 287: ......
Страница 288: ...Still GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 171673 EN ...