47
08/13424999756
Selecting the cables
Note:
For the motor supply cables of SHE drives 3 or 5 (duplicated layout) individual cores are required. Two
cores (4 cores) are for the motor voltage, the 3rd or 5th core respectively is required for monitoring the cabling. The se-
lection and layout of the cables is to be performed according to (model) utility facilities guidelines (MLAR). Here particular
attention is to be paid to E30 or E90 functionality retention!
Examples of cable types and fittings that can be used
Cable system, consisting of load support system and cables with appropriate fire protection tested wall plugs and screws.
Cable system in accordance with DIN 4102-12. Safety cable + layout system:
Cabling example
Compact control panel 4A, 4A/M und 8A, 8A/M
3 x ... mm²
**
5 x ... mm²
M
=
E30 / E90 cable
yellow-green: cannot be used for the calbing monitoring
brown
blue
Motor
junction box
Motor voltage
Cabling monitoring