10
11
fAUcET InSTALLATIOn
fAUcET InSTALLATIOn
STEP 1 – InSTALLInG ThE fAUcET
5
Assemble the rigid pipes between the nipples in
the box to the inlets in the Tubular base.
6
Insert the corrugated tube through the Tubular
box.
If required, cut it to the appropriate length as
needed by the installation.
7
Assemble the mud guard cover to the Tubular
box.
Note: the MIN and MAx marks on the box
8
Once the works on electricity, plumbing and
tiles have been finished:
a. Cut the temporary protective cover at the
proper mark in wall level.
b. Cut the box mud guard cover wherever
required by the installation.
9
Assemble the wall rosette over the Tubular base
and secure it using the 2 screws provided.
10
Connect the cables from the electronic unit to
the cables coming from the corrogated tube.
11
Connect the electronic unit connectors coming
from the corrugated tube into the box, to the
power splitter.
12
Fix the Tubular body to the rosette and secure
the screw with the Allen key. Make sure that this
area is clean before proceeding.
NOTE: Make sure that the aerator in the Tubular spout will be installed facing the
washbasin.
FROM THE ELECTRONIC UNIT
TO THE CORROGATED TUBE
TUBULAR
1000
B BOX /
1000
e BOX
TUBULAR
1000
B BOX /
1000
e BOX