10
Self test
The self test is mandatory for operation of inverters in Italy.
Function
The prerequisites for performing the self test are as follows:
•
The country
Italy
was selected during initial commissioning.
•
The level of solar irradiation is high enough to ensure that the inverter can feed the grid.
During the self test, the inverter checks its switch-off behaviour with regard to too high / too low
grid voltage and frequency (4 test phases, duration of approx. 2 minutes). The following applies:
•
In each phase of the self test, the inverter changes its switch-off threshold, step-by-step upwards/
downwards from the set lower/upper limit values.
•
When the switch-off threshold reaches the actual grid voltage/frequency then the inverter stores
this information.
•
The data is shown on the display as follows:
– The current values of the
first
test phase are displayed first; see Fig. 14.
– The values of the
subsequent
test phases are added below (initially hidden).
– If the self test succeeded then the status message
Self
test
passed
is added below. The
status message must be displayed and confirmed.
•
If the self test conditions are not satisfied, one of the status messages listed in Tab. 9 is displayed.
•
If a measurement lies outside the required tolerance during the self test then the self test is
cancelled and the inverter displays the status message
Self
test
failed
. The inverter remains
disconnected from the grid (relay open, no feeding) until the self test is passed successfully.
Note
The data stored in the inverter can be read using a PC and the
InverterSelftestProtocol
software.
More information on this is provided in the
StecaGrid Service_InverterSelftestProtocol
manual and
at www.stecasolar.com
PV grid connected
Software.
1
2
3
4
Upper / lower limit value according to the country setting
Measured actual grid voltage / frequency
Switch-off threshold (changed in steps)
Switch-off time = time between the following events:
–
Switch-off threshold reaches the actual grid voltage/
frequency
–
The inverter disconnects itself from the grid
Fig. 14: Self test – display of the test results
Operation
√
The country
Italy
is set in the inverter to be tested.
1. Check the country setting via
Information
/
System
info
in the main menu as required.
2. Select
Self
test
in the main menu. The dialog shown
at the left is displayed.
3. Press and hold
SET
for 1 second. The self test starts.
4. The values for the first test phase are displayed (fig.
left).
5. Press
to display the values for the subsequent test
phases (if available).
6. Only when
Self
test
failed
is displayed:
Press
SET
to confirm the status message. The status
display appears.
Note
If
Self
test
failed
is displayed then repeat the self test
as soon as possible so that the inverter can resume feeding.
71
744.378 | 12.13
EN
Содержание StecaGrid 10 000+ 3ph
Страница 42: ...121 744 378 12 13 Appendix Appendix Zertifikate Certificates Certificats...
Страница 43: ...122 744 378 12 13 Appendix...
Страница 44: ...123 744 378 12 13 Appendix Montage Installation Montage AC Stecker AC plug connecteur AC...
Страница 45: ...124 744 378 12 13 Appendix...
Страница 47: ...744378...