Finishing initial commissioning
1.
Press
ESC
to jump stepwise backwards and correct set-
tings
or
Press and hold
SET
for a longer period of time to finish
initial commissioning.
2. If
SET
was pressed for a longer time then the inverter
restarts anew and synchronises itself with the grid.
8.9
Switching on the DC supply
Set the DC circuit breaker on the inverter to position
I
(Fig. 12).
After testing via the internal MSD (approx. 2 minutes), the power fed into the grid can be shown
on the display (assuming that sunlight is present).