![Speck pumpen BADU BADUJET Turbo Pro Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/speck-pumpen/badu-badujet-turbo-pro/badu-badujet-turbo-pro_translation-of-original-operation-manual_1341777046.webp)
Maintenance
46 EN
08|2020
8 Maintenance
NOTICE
Disconnect the system from the mains before carrying out
maintenance work.
When?
What?
Regularly
Clear foreign bodies from
suction openings and propeller.
Turn the propeller wheel (after
longer standstill)
Re-tighten
screw
connections.
After completing all maintenance work, perform all necessary
measures for start-up. See point 6.1 on page 41.
Due to the various water components the parts made of stainless
steel have to be cleaned periodically to avoid possible corrosive
damage.
8.1 Warranty
The warranty includes the devices delivered and all components.
However natural wear and tear (DIN 3151/DIN-EN 13306) on all
turning and dynamically loaded components, including electronic
components under tension, is not covered under the warranty.
Failure to comply with the safety instructions may void the
warranty.
8.1.1 Safety-relevant spare parts
• Suction
guards
• Nozzle
housing
8.2 Service
addresses
Service addresses can be found on our website
www.speck-pumps.com
.
Содержание BADU BADUJET Turbo Pro
Страница 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Страница 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Страница 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Страница 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Страница 38: ...Installation 38 EN 08 2020 5 4 7 On off board circuit diagram Fig 20 5 4 8 Terminal box connections Fig 21 ...
Страница 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...