Installation
32 EN
08|2020
WARNING
Risk of electric shock due to incorrect connections!
Electrical connections must always be carried out by
authorised specialists.
Observe VDE and utility company regulations.
Install system for swimming pools and their protection areas
in accordance with DIN VDE 0100-702.
WARNING
Risk of electric shock due to voltage on the housing!
An overload switch which is set correctly must be installed for
pumps with three-phase motors without motor protection. In
doing so, observe the values on the motor name plate.
Install a disconnecting device with at least a 3 mm contact
gap per pole to interrupt the power supply.
Protect the circuit with a fault current circuit breaker, all
current-sensitive type B, rated error current I
FN
≤
30 mA.
Only use suitable pipe types according to regional
regulations.
Adjust minimum diameter of the electrical pipes to
accommodate the motor output and pipe length.
Do not bend or squash the pipes.
If hazardous situations can occur, provide an emergency off
switch according to DIN EN 809. The builder/operator must
make a decision according to this standard.
The included cables are not approved for laying in the
ground. The conduit FFKuS-EM-F 25 or, for easier pull-
through possibility, FFKuS-EM-F 32 is recommended. These
should also be used for casting in concrete.
5.4.1 Electrical connection of the countercurrent system
The circuit is partially wired ready for connection. The
connections that are still missing must be made by the
customer.
The frequency converter may only be mounted at the
available bore holes.
On-site connection:
•
Fault current circuit breaker I
FN
≤
30 mA, all current-sensitive
type B
Содержание BADU BADUJET Turbo Pro
Страница 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Страница 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Страница 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Страница 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Страница 38: ...Installation 38 EN 08 2020 5 4 7 On off board circuit diagram Fig 20 5 4 8 Terminal box connections Fig 21 ...
Страница 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...