![Speck pumpen BADU BADUJET Turbo Pro Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/speck-pumpen/badu-badujet-turbo-pro/badu-badujet-turbo-pro_translation-of-original-operation-manual_1341777018.webp)
Installation
18 EN
08|2020
5.1.8 Frequency converter installation instructions
NOTICE
The frequency converter should only be installed by a qualified
electrician.
See the enclosed original operating instructions for full
information about the frequency converter.
The converter may only be installed vertically.
It must be installed on a suitable level and flame-retardant
surface.
Never store inflammable materials in the vicinity of the
converter.
The installation site should be vibration-free.
Never install the converter in areas with excessive moisture,
aggressive chemicals or potentially dangerous dust particles
in the air.
Do not install the converter in the vicinity of heat sources with
high radiation.
Protect against direct sunlight. Install sun protection if
necessary.
The installation site must be free from risk of frost.
The air flow through the converter may not be obstructed.
The heat from the converter must dissipate naturally.
A suitable pressure compensation valve must be installed in
the feed-through plate in case of heavy fluctuations in the
ambient pressure and temperature.
NOTICE
If the converter has been in storage for longer than 2 years, the
intermediate circuit capacitors must be freshly reformed before it
is put back into operation. See the manufacturer’s documentation
for this.
Содержание BADU BADUJET Turbo Pro
Страница 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Страница 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Страница 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Страница 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Страница 38: ...Installation 38 EN 08 2020 5 4 7 On off board circuit diagram Fig 20 5 4 8 Terminal box connections Fig 21 ...
Страница 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...