![Speck pumpen BADU BADUJET Turbo Pro Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/speck-pumpen/badu-badujet-turbo-pro/badu-badujet-turbo-pro_translation-of-original-operation-manual_1341777037.webp)
Installation
08|2020 EN
37
15. The EMC screw-type gland must be closed and tightened
after completing the wiring. Make sure that the lugs on the
plastic part grip into the groove. Only then is the position of
the plastic part interlocked.
•
Remove the transport cap and O-ring from the motor plug.
•
The motor plug rotates.
•
The cable and motor are connected by a bayonet catch.
5.4.6 Wiring diagram 3-phase 400/230V 50 Hz
Fig. 19
Содержание BADU BADUJET Turbo Pro
Страница 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Страница 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Страница 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Страница 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Страница 38: ...Installation 38 EN 08 2020 5 4 7 On off board circuit diagram Fig 20 5 4 8 Terminal box connections Fig 21 ...
Страница 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...