Installation
08|2020 EN
17
5 Installation
5.1
Installation site (Qualified specialist)
5.1.1 Installation
point
•
The system is normally installed at the narrow side of the
pool with a recommended minimum pool size of 3.5 x 6 m.
•
It cannot be installed in a round or oval pool.
5.1.2 There must be ground drainage
Calculate the size of the ground drain according to the
following criteria:
• Size of the swimming pool.
• Circulation flow rate.
5.1.3 Ventilation and aeration
Ensure sufficient ventilation and aeration. The ventilation and
aeration must ensure the following conditions:
• Prevention
of
condensation.
• Minimum distance from motor to the wall: min. 300 mm.
• Cooling of the motor and other system components, for
example switch cabinets and control units.
• Limitation of the ambient temperature to maximum 40 °C.
5.1.4 Structure-borne and airborne noise transmission
Observe the regulations for constructional noise protection,
for example DIN 4109.
Install the system so that the structure-borne noise and
airborne noise are reduced. Use vibration-absorbing
materials such as blanket insulators for example.
5.1.5 Space
requirements
Leave enough space to be able to remove the motor and drive
unit from the rear of the housing.
5.1.6 Fastening
elements
Fasten the system parts with screws.
5.1.7 Swimming pool with overflow gutter
Pay attention to adequate dimensioning of the overflow
gutter, piping and splash-water tank when planning the
swimming pool.
Содержание BADU BADUJET Turbo Pro
Страница 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Страница 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Страница 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Страница 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Страница 38: ...Installation 38 EN 08 2020 5 4 7 On off board circuit diagram Fig 20 5 4 8 Terminal box connections Fig 21 ...
Страница 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...