Installation
08|2020 EN
33
•
Fuse 1~ 230 V/3~ 400 V safety fuse 16 A slow-blow or
16 A-K-automatic cut-out
•
Shot-circuit switching capability I
CN
≤
6 kA
•
Emergency stop switch, all-pole-switching, with 0 and 1
labelling
• Cable
power
supply
distributor (house connection) to the
terminal box: H07RN-F, 5G 2.5
•
Cable terminal box to frequency converter (on/off switch):
H07RN-F, 4G 2.5
An additional protection potential equalisation, connected to
the earth strap, must be provided on the motor for potential
equalisation.
See the wiring diagrams for additional information. The parts
named above are not part of the scope of supply and must be
provided by the customer when installing the system.
5.4.2 Connection
diagram
The diagram below shows an overview of how all the connections
are to be wired. The on-site wiring of the motor cable and control
cable is explained in separate chapters.
Fig. 17
5.4.3 Preparation
of the control cable
1. Shorten the control cable to the appropriate length (customer
end).
2. Strip the grey control cable approx. 15 cm.
3. Carefully separate the shield.
4. Fit the wire end ferrules to the wires.
5. Wire according to the circuit diagram.
Содержание BADU BADUJET Turbo Pro
Страница 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Страница 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Страница 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Страница 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Страница 38: ...Installation 38 EN 08 2020 5 4 7 On off board circuit diagram Fig 20 5 4 8 Terminal box connections Fig 21 ...
Страница 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...