![Speck pumpen BADU BADUJET Turbo Pro Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/speck-pumpen/badu-badujet-turbo-pro/badu-badujet-turbo-pro_translation-of-original-operation-manual_1341777036.webp)
Installation
36 EN
08|2020
7. Shorten the 3 black wires (U, V, W) to 6 cm. Shorten the
earth wire (yellow/green) to 8 cm.
8. Remove film, sheath, aluminium foil and shield from the two
thin wires. The length is left at 14 cm.
9. Fit a wire end ferrule (blue) to the end of each wire U, V, W.
Fit a ring cable shoe to the earth wire. Fit red wire end
ferrules to the thin wires (brown, white). The ring cable
shoe is included in the scope of supply.
10. Cut off the cable strain relief.
11. The rest of the EMC gland must be screwed into the feed-
through plate on the frequency converter. Align the claws of
the enclosed lock nut to the feed-through plate. Do not
remove the feed-through plate.
12. The wires U, V, W must be inserted into the plug. Observe
the labelling. The plug contacts must be opened first if
necessary.
13. Fasten the earthing cable with the ring cable shoe in the FC
with a screw. The screw must be loosened first.
14. The wires for the PTC (brown/white) must be connected
according to the circuit diagram. See "Fig. 18" on page 34
Note:
The earthing cable on the customer side must also have a
ring cable shoe.
Содержание BADU BADUJET Turbo Pro
Страница 1: ...EN EN Translation of original operation manual Submerged counter swim unit ...
Страница 20: ...Installation 20 EN 08 2020 Pool cutout for concrete pools formwork Fig 4 ...
Страница 21: ...Installation 08 2020 EN 21 Installation of formwork for concrete pools Fig 5 ...
Страница 34: ...Installation 34 EN 08 2020 5 4 4 Control cable wiring diagram Fig 18 ...
Страница 38: ...Installation 38 EN 08 2020 5 4 7 On off board circuit diagram Fig 20 5 4 8 Terminal box connections Fig 21 ...
Страница 49: ...Technical Data 08 2020 EN 49 10 2 Exploded drawing Fig 26 ...