14
7
.
Inspection before operation:
For the sake of safety operation and good situation of the electric truck, it is compulsory to check the truck
completely before operation. Contact the sales department of our company when founding problems.
7
.
1 Check point and check content:
No.
Check point
Check content
Braking
system
1
Operation handle
When the operation handle is turned, with
the handle switching between area A and B,
there is a noise from the brake.
2
Brake clearance
The clearance between brakes should be
kept between 0.2mm and 0.8mm.
Steering
system
3
Operation handle
Degree of tightness and rotary flexibility.
4
Oil pipe
Leakage or not.
5
Hydraulic oil
Appropriate oil quantity.
6
Lifting oil cylinder
Whether there is any oil leakage.
Wheels
7
Pins, screws and all the
fasteners
Check all the fasteners of the truck’s wheels,
i.e. pins or screws, loose or not.
8
Wearing status
Compare the parameter lists, replace the
wheel when its diameter reduces by 5%.
Storage
battery
9
Charge
Confirm the display state of the battery
capacity.
10
Electrolyte
The solution level and density of electrolyte.
11
Connecting line
The connecting line and socket shall be firm.
Horn
12
Horn
Press down the horn button to check
whether the horn sounds.
Instrument
13
Function
Turn on the switch of electric lock to check
whether the instrument displays normally or
not.
Others
14
Function
Check that whether lifting, lowering, forward
& backward movement and emergency
reverse of the truck is normal, and if there is
any abnormal noise.
8
.
Inspection after operation:
After operation, the smudge on truck shall be wiped out. Besides, the following check shall be carried out:
Keep visibility of all graphics context marks such as warning signs, nameplates and notice board. These marks
are able to instruct, caution and warn the operator to some degree.
The situation about deformation, distortion, damage or breakage
Add lubricating oil and grease if necessary.
Replace faulty components.
Содержание CTD10R-E
Страница 1: ...CTD10R E Electric Pallet Stacker Operation Manual Parts Catalogue ...
Страница 6: ...1 1 Outline drawing 1 1 CTD10R E Outline drawing ...
Страница 31: ...26 Hydraulic Schematic Diagram standard ...
Страница 32: ...27 AC 220V E 24V 65Ah CH 24V 10A CURTIS 1212 Electric Schematic Diagram standard ...