BeerBlast™ 7/14KPH & N
2
-GEN
™ 7/14KPH O&M
South-Tek Systems
11
4
PRODUCT INSTALLATION
4.1
UNPACKING AND PREPARATION (
BEERBLAST™ 7KPH / N
2
-
GEN™ 7KPH)
The
BeerBlast™ 7KPH / N
2
-
GEN™ 7KPH’s cardboard carton should be carefully opened and all parts should be
inspected for damage upon receipt. Identify and verify that all parts listed on the packing list are present and
undamaged. South-Tek Systems (STS) is not responsible for damages that have occurred during the shipping and
handling of the
BeerBlast™ 7KPH / N
2
-
GEN™ 7KPH. Any visual damages should be immediately documented
and reported to the shipping company responsible. Then, contact STS at (888)526-6284 to assess the
damages only after the shipping company has been notified.
Until Installation:
Store the
BeerBlast™ 7KPH / N
2
-
GEN™ 7KPH in a dry and climate controlled (60-80°F) room.
Always keep
BeerBlast™ 7KPH / N
2
-
GEN™ 7KPH in an upright position / or in box as shipped.
Do not connect the AC power cable until this manual has been read completely and all
connections are made as stated within.
Keep all gas lines dry so moisture does not enter generator upon hookup.
Never place/stack objects on top of the
BeerBlast™ 7KPH / N
2
-
GEN™ 7KPH.
Содержание BEERBLAST 14KPH
Страница 3: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 3 Notes Page ...
Страница 5: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 5 Notes ...
Страница 16: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 16 ...
Страница 17: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 17 ...
Страница 19: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 19 Figure 1 100 N2 Storage Tank Setup ...
Страница 31: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 31 Last Page ...