BeerBlast™ 7/14KPH & N
2
-GEN
™ 7/14KPH O&M
South-Tek Systems
21
Once the connections are all secure, turn on the power (switch is located externally on the upper left side of the
cabinet on the control panel). The initial start-up will require up to 1 hour to fully pressurize the internal storage tank
to the correct level. External pressure gauge (at the top coming off the 4
th
port from the left) can be viewed to verify
that the internal storage tank has been filled to 65-75 psig. Once the tank is full, the system will automatically go
into a standby mode and is ready for standard operation.
Содержание BEERBLAST 14KPH
Страница 3: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 3 Notes Page ...
Страница 5: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 5 Notes ...
Страница 16: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 16 ...
Страница 17: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 17 ...
Страница 19: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 19 Figure 1 100 N2 Storage Tank Setup ...
Страница 31: ...BeerBlast 7 14KPH N2 GEN 7 14KPH O M South Tek Systems 31 Last Page ...