◇
29
Setting
Mark
Description
PASS
At the end of the test, the signal is valid when all unit tests pass.
FAIL
At the end of the test, the signal is valid when all unit tests fail.
BAK
Undefined(Backup)
WAIT
When the test is started, when there is no output at high voltage, the signal is
valid.
READY
Non-test status of system idle, the signal is valid.
TEST
From pressing START to the end of the entire file test, the signal is valid.
DANGER
When there is high voltage output, the signal is valid.
PROG
ERR
System malfunction, the signal is valid.
4.2.4
FILE storage interface
The file interface is used to save the edited test file, or call a previously edited test file.
Press the “FILE” button to enter, press the “FILE” button again to switch the sub-interface.
The internal file operation interface is indicated:
Figure 4.2.4.1 internal file operation interface