1-13 (E)
UP-CX2
W2.3
E4.0
Worm wheel (R)
Pendulum
assembly (S)
Pendulum
assembly (L)
Idler gear (R)
Ribbon (T) motor assembly
SU-113 board
Solders
PS2.6
x
5
Approx. 1 cm
(0.4 inches)
Shaft
Ribbon (T) motor assembly
Grease an entire loop of the gear portion of the
ribbon (T) motor assembly.
(approx. 1 cm (0.4 inches) width area centering
around the shaft.)
Grease an entire loop of the gear portion of the
ribbon (S) motor assembly.
(approx. 1 cm (0.4 inches) width area centering
around the hole.)
Approx. 1 cm
(0.4 inches)
Hole
Ribbon (S) motor assembly
11. Remove the snap ring (W2.3), then remove the pendulum assembly (S), idler gear (R), and pendulum
assembly (L).
12. Remove the snap ring (E4.0), then remove the worm wheel (R).
13. Remove the two screws (PS2.6
x
5), then remove the ribbon (T) motor assembly.
14. Unsolder the two pins, then remove the SU-113 board.
15. To install, reverse the removal procedure.
n
When installing the ribbon (T) motor assembly and ribbon (S) motor assembly, grease the speci
fi
ed
grease as shown in the
fi
gure.
Parts
No.:
7-651-000-11
Name:
Sony grease SGL-801
Содержание UP-CX2
Страница 1: ...DIGITAL PHOTO PRINTER UP CX2 SERVICE MANUAL 1st Edition ...
Страница 6: ......
Страница 44: ......
Страница 62: ......
Страница 82: ......
Страница 92: ......
Страница 94: ...7 2 UP CX2 7 2 Exploded Views Top and Side Panel Block 2 1 3 5 5 5 5 4 6 10 7 9 8 ...
Страница 120: ......
Страница 121: ......
Страница 122: ...Sony Corporation UP CX2 CN UP CX2 SY J E 9 968 775 01 2010 11 08 2010 ...