NETYS RT 5 - 7 - 9 - 11 kVA - 551570A - SOCOMEC
38
EN
3 Carefully lift the whole unit upright
4
with the Socomec logo nameplates and
the icons shown on the panels facing up.
Lift up 90°
S
ESC
S
ESC
4
(Figure 6-5: Place the Whole Unit Upright)
4 Place the whole unit inside the tower stands
5
.
5
S
ESC
S
ESC
(Figure 6-6: Place the Whole Unit inside the Tower Stands)
Leave adequate space (at least 50cm) around all sides of the unit for good ventilation.
A minimum of two people are required to execute 3 and 4 .
Содержание NETYS RT 1100 VA
Страница 1: ...5000 7000 9000 11000 VA NETYS RT INSTALLATION AND OPERATING MANUAL EN www socomec com netys manuals ...
Страница 2: ......
Страница 103: ......