30 of 75
Figure 23. Air Connections
NOTE:
For those units equipped with jacking beams, this is the appropriate time to
install them. Consult the jacking beam instruction manual found in each jacking beam
box.
6. Hook up an air supply to the inlet of the FRL. (Note: customer to supply this fitting)
7.9 ELECTRICAL CONNECTIONS
CAUTION: ALL ELECTRICAL CONNECTIONS SHOULD BE MADE BY A
LICENCED ELECTRICIAN.
Refer to
Figure 24
, Electrical Diagram for electrical connections.
Electrical Breaker Size Recommendation: 20Amps
Figure 24. Electrical diagram for 230V/1 ph
Содержание Hofmann ALIGNMENT FPA18210
Страница 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Страница 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Страница 15: ...15 of 75 Figure 3 Chalk line layout...
Страница 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Страница 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Страница 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Страница 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Страница 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Страница 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Страница 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Страница 70: ...70 of 75 12 14CABLE ROUTING...
Страница 72: ...72 of 75 12 16POWER PACK ASSEMBLY...