2. Locate and identify the coiled cables as follows, place close to the rear of the left
side of the chalk outlines.
(Table 2)
:
Cable P/N
Location
Length
2-1360 Front
Left 407.5"
2-1361 Front
Right 473.5"
2-1362 Rear
Left 162"
2-1363 Rear
Right 228"
7.0 INSTALLATION
INSTRUCTIONS
7.1 ASSEMBLY OF CABLES TO LEFT SIDE DECK
1. Place the left deck assembly so that the inside edge lies along chalk line “B”.
2. Place the right deck assembly so that the inside edge lies along chalk line “C”.
3. Position both decks so that the front edge lies along chalk line “2”.
4. Using a floor jack or engine hoist, lift the left side runway and support with (4)
jack stands
(see Figure 5)
or other means of support. Use the floor jack or
engine hoist as addition support.
5. If possible, repeat for right side deck.
Figure 5: LS Deck Support
Table 2: Cable
Identification
Содержание Hofmann ALIGNMENT FPA18210
Страница 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Страница 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Страница 15: ...15 of 75 Figure 3 Chalk line layout...
Страница 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Страница 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Страница 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Страница 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Страница 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Страница 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Страница 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Страница 70: ...70 of 75 12 14CABLE ROUTING...
Страница 72: ...72 of 75 12 16POWER PACK ASSEMBLY...