19 of 75
Assemble lower thrust washer and pulley and reinstall the pulley pin to
hold these in place.
Assemble four more thrust washers (as shown) and the top pulley with
front left cable 2-1360 wrapped around the pulley. Push pulley pin further
up to hold these in place.
Install remaining thrust washers and 1" spacer then complete assembly of
pulley pin and lock in place with hardware.
Install rear right cable 2-1363 around the lower pulley.
Figure 7. Rear Pulley Stack Assembly
Figure 8. Front Left and Rear Right Cable Installed at Rear
Содержание Hofmann ALIGNMENT FPA18210
Страница 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Страница 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Страница 15: ...15 of 75 Figure 3 Chalk line layout...
Страница 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Страница 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Страница 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Страница 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Страница 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Страница 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Страница 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Страница 70: ...70 of 75 12 14CABLE ROUTING...
Страница 72: ...72 of 75 12 16POWER PACK ASSEMBLY...