5 of 75
Lockout/Tagout of Energy Sources
, before beginning any lift repairs and
maintenance.
7. The Owner/Employer shall not modify the lift in any manner without the prior
written consent of the manufacturer.
DO NOT ATTEMPT TO OPERATE THIS LIFT IF ANY PART
IS NOT WORKING PROPERLY OR YOU HAVE NOT READ THE COMPLETE
OPERATING INSTRUCTION MANUAL.
2.0 IMPORTANT SAFETY INSTRUCTIONS
1.
When using this lift, basic safety precautions should always be followed,
including the
following:
2. Read all instructions in this manual and on the lift thoroughly before installing,
operating, servicing or maintaining the lift.
3. Care must be taken as burns can occur from touching hot parts.
4. Do not operate equipment with a damaged cord or if the equipment has been
dropped or damaged – until it has been examined by a qualified service person.
5. Do not let a cord hang over the edge of the table, bench, or counter or come in
contact with hot manifolds or moving fan blades.
6. If an extension cord is necessary, a cord with a current rating equal to or more
than that of the equipment should be used. Cords rated for less current than the
equipment may overheat. Care should be taken to arrange the cord so that it will
not be tripped over or pulled.
7. Always unplug equipment from electrical outlet when not in use. Never use the
cord to pull the plug from the outlet. Grasp plug and pull to disconnect.
8. Let equipment cool completely before putting away. Loop cord loosely around
equipment when storing.
9. To reduce the risk of fire, do not operate equipment in the vicinity of open
containers of flammable liquids (gasoline).
10. Adequate ventilation should be provided when working on operating internal
combustion engines.
11. Keep hair, loose clothing, fingers, and all parts of body away from moving parts.
12. To reduce the risk of electric shock, do not use on wet surfaces or expose to rain.
Содержание Hofmann ALIGNMENT FPA18210
Страница 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Страница 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Страница 15: ...15 of 75 Figure 3 Chalk line layout...
Страница 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Страница 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Страница 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Страница 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Страница 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Страница 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Страница 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Страница 70: ...70 of 75 12 14CABLE ROUTING...
Страница 72: ...72 of 75 12 16POWER PACK ASSEMBLY...