20 of 75
10. Referring to
Figure 7
and
Figure 9
, assemble the right side of the pulley stack,
as shown, with cables 2-1362 & 2-1361.
Pass the rear left cable 2-1362 between the two pulleys on the left side
(shown above).
Starting from the bottom right side of the pulley stack, assemble the 1"
spacer, lower thrust washers and pulley. Reinstall the pulley pin to hold
these in place. Wrap around the front right cable 2-1362 on to the pulley.
Assemble four thrust washers as shown and the top pulley with front right
cable 2-1361 wrapped around the pulley. Push pulley pin further up to
hold these in place.
Add remaining single thrust washer and complete installation of pulley
pin and hardware to secure.
Note: If top thrust washer does not fit, remove one thrust washer from
middle of assembly.
Figure 9. Front Right and Rear Left Cable Installed at Rear
11. Use
Figure 10
as reference during the front pulley stack and cable assembly.
Содержание Hofmann ALIGNMENT FPA18210
Страница 8: ...8 of 75 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS...
Страница 13: ...13 of 75 6 1 TYPICAL BAY LAYOUT Figure 2 Typical Bay Layout...
Страница 15: ...15 of 75 Figure 3 Chalk line layout...
Страница 44: ...44 of 75 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes...
Страница 57: ...57 of 75 12 0 PARTS LIST 12 1 LIFT ASSEMBLY...
Страница 59: ...59 of 75 12 3 TOWER ASSEMBLY...
Страница 61: ...61 of 75 12 5 DECK ASSEMBLY LEFT SIDE...
Страница 63: ...63 of 75 12 7 CROSSMEMBER ASSEMBLY...
Страница 65: ...65 of 75 12 9 CYLINDER ASSEMBLY...
Страница 67: ...67 of 75 12 11 HYDRAULIC AND AIR KIT...
Страница 70: ...70 of 75 12 14CABLE ROUTING...
Страница 72: ...72 of 75 12 16POWER PACK ASSEMBLY...