4
TOOLS REQUIRED
The following list of tools is required to complete this installation:
INSTALLATION STEPS
• Phillips Screwdriver
• Standard Screwdriver
• Adjustable Wrench or Set of Open End
Wrenches
• Socket Wrench and Extension, 3/8” drive
• ½” Socket
• 3/4” socket
• Wire, 14 gauge, red, green and white
• Wire cutters
• Wire strippers
• Wire crimpers
• Wire nuts
• Control Panel Schematic
• Teflon
tape
• Plumbers’ Grease, Petroleum Jelly or
non pumice hand soap
• Drill – ½” drive
• 3/4” Drill Bit or Knockout (to put a
3/4” hole in the control panel)
• #20 Drill Bit
• Hammer
• Punch
• Knife
BEFORE YOU START!
Make sure you have the pump’s flow conditions monitored during this procedure to prevent
overflow. Depending upon the flow conditions of the pump station, it may be necessary to pump
the wet well down to the “off” level float. Some pump stations may require a Vac Truck on site
during this installation. Only work on one pump at a time, in case the wet well needs to be pumped
down. Close the plug valve for the pump that is going to be worked on.
CAUTION:
Use proper personal safety equipment when installing this kit. Eye
protection, non-skid safety shoes, hard-hat, hearing protection and gloves must be
used for the appropriate condition. Failure to do so could result in bodily injury.
DANGER:
Disconnect and lock out power before servicing the equipment. Failure to
do so could result in electrical shock, serious bodily injury or death.
!
!