HRX-OM-S004
Chapter 3 Transport and Setting Up
3.3
Installation
HRS Series
3-14
In case of option B [Earth leakage breaker],HRS
∗∗∗
-
∗∗
-40-
∗
A breaker that has the operating characteristic below is installed. Please use a
breaker that has the same or longer operating time as/than this for the user’s side
(primary side). If it is a shorter operating time, there is a possibility of accidental
breaker trip due to the internal motors’ inrush currents of this product.
100 125
200
300 400 500
600
700
1000
1500 2000
30004000
5000
6000
7000
10000
0.02s
0.01s
0.05s
0.1s
0.2s
0.5s
1s
2s
5s
10s
20s
30s
1min
2min
4min
6min
10min
14min
20min
30min
1h
2h
4h
Min.
O
per
ati
ng
ti
me
Current (% for breaker capacity)
Max.
For HRS100-A/W-20/40, HRS150-A/W-40
4h
2h
1h
30min
20min
14min
10min
6min
4min
2min
1min
30s
20s
10s
5s
2s
1s
0.5s
0.2s
0.1s
0.05s
0.02s
0.01s
100
125
200
300
400 500 600700
1000
1500 2000
3000 4000
Current (% for breaker capacity)
O
perat
ing ti
m
e
Min.
Max.
For HRS150-A/W-20
Содержание HRS090-A
Страница 8: ...HRX OM S004 Contents HRS Series...
Страница 20: ...HRX OM S004 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRS Series 2 6...
Страница 56: ...HRX OM S004 Chapter 3 Transport and Setting Up 3 5 Circulating Fluid Supply HRS Series 3 36...
Страница 66: ...HRX OM S004 Chapter 4 Starting the Product 4 6 Adjustment of Circulating Fluid flow rate HRS Series 4 10...
Страница 164: ......
Страница 174: ......
Страница 192: ...HRX OM S004 Chapter 8 Documents 8 9 Daily Check Sheet HRS Series 8 18...
Страница 195: ......