22
7. Installation & Wiring
7-1 Installation
7-1-1 Installation of Cylinder
1. During installation of metal fitting onto the end (screw thread) of piston rod, prevent from the
induction of impact and unbalance loading acting upon it.
2. During mounting of cylinder and load, care should be taken not to give misalignment non twist.
Please attach floating joint between the connection.
3. Make sure that pushing force of cylinder act on the centre of load.
4. Do not disassemble cylinder and dismantle sensor from cylinder.
5. Flushing of pipe should be done. Prevent dust & dirt entering into cylinder. Moreover, mist separator
should be used to get rid of water vapor, oil and dirt from the utilized comprised air.
6. When oil is needed to be fed in, use turbine oil class 1 (ISO, VG32).
7. If there is a lot of dust at working environment, use gaiter. Besides that , please take note that
operating temperature should be kept between 0 to 60
℃
.
8. The total length of air piping (from cylinder to solenoid valve) should be kept below 1m.
7-1-2 Installation of Controller
1. During installation of controller, use M4 bolt and DIN rail.
2. Prevent from direct shining of sun, high or low temperature
’s environment.
[Operating temperature range : 0
℃~
50
℃
]
3. Do not utilize it at high humidity
’s environment.
[Operating humidity range : 25%
~
85%]
4. Keep it within noise protection material and away from high voltage and power supply wire.
5. Prevent it from mounting in environment containing a lot of dust, salinity, ferrous, or flammable,
corrosive gas.
6. Do not mount it at high vibration and impact environment.
[Proof Vibration : 10
~
55Hz, range 0.75mm, x, y, z each axis for 2 hours]
7-2 Wiring
7-2-1 The Connection of Power Supply
Power Supply Specification : AC100V
±
15% (AC85V
~
AC115V), 50/60Hz
DC24V
±
10%, 0.4A
Use wire with 0.75mm
2
or more in the diameter of wire sectional area and twist it.
FG is meant for preventing lightening strike, use wire, 0.75mm
2
or more in the diameter of wire
sectional area, to connect to earth.
If FG is not connected to earth, controller
’s noise filter will not be able to function properly. Hence, noise
will be generated and lead to misreading / disoperation of cylinder.
7-2-2 The Connection of Extension Cable
Use specified (SMC) extension cable. Cable length, 5m
~
20m, with interval of 5m. For distance more
than 20m, use specified transmitter
・
Receiver box (Model : CE1-H0374)
*
Example on cable Connection
Above 20m
Extension Cable
(CE1
-
R
※※
)
Содержание CE2
Страница 14: ...2 2 System Configuration...
Страница 20: ...5 External Dimension Drawing 5 1 Monosashi kun with Brake...
Страница 21: ......
Страница 22: ...5 2 Controller...
Страница 23: ...5 3 Extension Cable...
Страница 27: ...7 3 Input Signal Wiring 7 3 1 Input Signal Wiring Diagram...