1)
Active in auto mode;
2)
System type is set to "S1-Gen S2-Gen";
3)
Output port shall be set to "S1 Genset Working" and "S2 Genset Working";
4)
Input port shall be set to "S1 Genset Fault Input", "S2 Genset Fault Input", and "Remote Start On
Load" or "Remote Start Off Load";
5)
"Gen-Gen Start Mode" shall be set;
6)
"Genset Available Time" shall be programmed; if start method is Cycle Start, "S1 Cycle Work Time"
and "S2 Cycle Work Time" shall be set.
"S1 Genset Fault Input" and "S2 Genset Fault Input" in the input ports are alternate configurations. Users
can also judge whether there is genset fault by "Genset Available Time", without connecting genset
status in the input port.
When S1 Gen S2 Gen start method is set to None, there will not any genset start signal output.
For example:
Table 17 Start Example Illustration
System Type
Start Conditions
Start Result
S1 Gen S2 Gen
Input port is active. (Remote Start On Load/Remote Start
Off Load)
S1 genset start
outputs.
Master set is set to: S1 Master
8.2.3
SCHEDULED GEN START
When "Schedule Gen Enable" function is enabled, users can set scheduled gen start time. Controller will
issue start signal when the time is up. When scheduled start lasting time is over, start signal is
disconnected. Scheduled Run On Load or Off Load can be set.
Scheduled Start On Load: genset start outputs, and when generating is OK, gen closes;
Scheduled Start Off Load: genset start outputs, and when mains is OK, mains close.
Scheduled Start cycle time can be set to start monthly, weekly, or daily.
Schedule Monthly: which month to start, start date and time can be set.
Schedule Weekly: start at the same time for multiple days in a week can be set. For example: Set it from
Monday to Friday, start at 8:00 and last 10 hours.
Schedule Daily: start at the same time for each day can be set.
8.2.4
SCHEDULE NOT WORK
After Schedule Not Work function is enabled, users can set scheduled not work time. Controller will
disconnect start signal when the scheduled time is due. Start signal is prohibited before the end of
Scheduled Not Work lasting time.
Scheduled Not Work cycle time can be set to Not Run Monthly, Weekly, Daily, three methods.
Scheduled Not Work Monthly: Which month to not run can be set, so do not run date and time;
Scheduled Not Work Weekly: Not run for multiple days in a week can be set; For example: Set it from
Monday to Friday, not run at 19:00 every day, lasting for 12 hours;
Scheduled Not Work Daily: Not run at the same time every day can be set.
NOTE:
Schedule Not Work is prior to Schedule Start Operation.