Activation and Deactivation
SMA Solar Technology AG
60
SI5048-TEN093630
Technical Description
9 Activation and Deactivation
9.1 Activation
1. Check the following requirements:
– correct electrical connections
– voltages and polarities
2. Switch the DC circuit breaker of the Sunny Island to the "ON" position.
☑ The display of the Sunny Island lights up.
☑ The Sunny Island initiates the startup phase.
The notifications shown here are issued. The last
notice is issued as soon as the start phase is
completed.
3. Start QCG. Press and hold down <ENTER> until the Sunny Island beeps three times.
☑ The QCG is started and the notice shown here
is displayed. Continue as in chapter
8.2 ”Starting the Quick Configuration Guide
(QCG)” (page 55).
or
Systems with several Sunny Islands
Switch the slaves on
before
the master. To do this, proceed as follows.
Parameter "250.01 AutoStr"
Even with the "250.01 AutoStr" parameter set, the Sunny Island must be manually started
after each time the device is switched on using the DC circuit breaker.
SIBFSBOOT V1.004
SI5048
@SMA 2009
01#StartMenu
Start System
Содержание SI 5048
Страница 1: ...SI5048 TEN093630 TBE SI5048 Version 3 0 EN Off grid Inverter SUNNY ISLAND 5048 Technical Description...
Страница 2: ......
Страница 10: ...Table of Contents SMA Solar Technology AG 10 SI5048 TEN093630 Technical Description...
Страница 43: ...SMA Solar Technology AG Electrical Connection Technical Description SI5048 TEN093630 43...
Страница 66: ...Operation SMA Solar Technology AG 66 SI5048 TEN093630 Technical Description Overview of the menu structure...
Страница 209: ......
Страница 210: ......
Страница 212: ...4 4PMBS 5FDIOPMPHZ XXX 4 EF...