7
overturn the package!! When transporting it make sure that it is firmly held by the four corners
(keeping it parallel to the floor).
WARNING!
All operations must be carried out by
specialized personnel (Fig. n°9).
2.1 - UNPACKING
Remove the straps from the package (Fig. n°10)
0)
and lift the ca
oard (h).
The package should be:
(Fig. n°11)
a)
the machine on the pallet (detail a);
b)
blade extractor (detail e);
c)
4 feet (detail f);
d)
Case, if present (detail b).
Check inside the suitcase if it present, find the
following components:
(Fig. n°11):
1.
Instruction manual (detail d) ;
2.
CE
compliance certificate (detail c);
3.
. Audio-
sual cd;
4.
Liquid detergent with sprayer;
5.
. Oi
tube;
6.
Sharpening and burring grinders;
7.
Socket wrench to remove grinders;
8.
. Grinder
brush;
9.
Large and small screwdrivers.
10.
0. Pli
.
CHAP. 2 - INSTALLATION
Fig. n°9
Fig. n°10
h
a
b
c
d
Fig. n°11