30
ENGLISH
Always quote the machine serial number in all
communications to the manufacturer, Nuova
Simonelli.
The machine is transported on pallets which
also contain other machines - all boxed and
secured to the pallet with supports.
Prior to carrying out any transport or handling
operation, the operator must:
put on work gloves and protective footwear,
as well as a set of overalls which must be
elasticated at the wrists and ankles.
The pallet must be transported using a suit-
able means for lifting (e.g., forklift).
During all handling operations, the operator
must ensure that there are no persons,
objects or property in the handling area.
The pallet must be slowly raised to a height
of 30 cm (11,8 in) and moved to the loading
area. After first ensuring that there are no
persons, objects or property, loading opera-
tions can be carried out.
Upon arrival at the destination and after
ensuring that there are no persons, objects
or property in the unloading area, the prop-
er lifting equipment (e.g. forklift) should be
used to lower the pallet to the ground and
then to move it (at approx. 30 cm (11,8 in)
from ground level), to the storage area.
Before carrying out the following operation,
the load must be checked to ensure that it is
in the correct position and that, when the
supports are cut, it will not fall.
The operator, who must first put on work
gloves and protective footwear, will proceed
to cut the supports and to storing the prod-
uct. To carry out this operation, the techni-
cal characteristics of the product must be
consulted in order to know the weight of the
machine and to store it accordingly.
3.
TRANSPORT AND HANDLING
3.1
MACHINE
IDENTIFICATION
3.2
TRANSPORT
3.3
HANDLING
CAUTION
RISK OF IMPACT OR CRASHING
CAUTION
RISK OF IMPACT OR CRASHING
Fig. 10
Содержание APPIA II
Страница 2: ......
Страница 8: ...4 ITALIANO ...
Страница 28: ...24 ENGLISH ...
Страница 48: ...44 FRANÇAIS ...
Страница 65: ...61 ...
Страница 66: ...62 IMPIANTO ELETTRICO ELECTRIC SYSTEM INSTALLATION ÉLECTRIQUE 1 2 3 5 9 6 8 7 Fig 31 4 ...
Страница 68: ...64 1 2 3 5 10 11 7 4 IMPIANTO ELETTRICO ELECTRIC SYSTEM INSTALLATION ÉLECTRIQUE Fig 32 6 8 9 ...
Страница 70: ...66 Fig 33 1 2 3 6 4 5 7 9 11 14 15 8 IMPIANTO IDRAULICO PLUMBING SYSTEM INSTALLATION HYDRAULIQUE 10 16 12 13 ...
Страница 73: ...69 NOTE NOTES ...
Страница 74: ...70 NOTE NOTES ...
Страница 75: ......
Страница 78: ......
Страница 84: ...4 DEUTSCH ...
Страница 104: ...24 ESPAÑOL ...
Страница 121: ...41 ...
Страница 122: ...42 ALEKTRISCHE ANLAGE INSTALACIÓN ELÉCTRICA Appia V 1 2 3 5 9 6 8 7 Fig 31 4 ...
Страница 124: ...44 1 2 3 5 10 11 7 4 ALEKTRISCHE ANLAGE INSTALACIÓN ELÉCTRICA Appia S Fig 32 6 8 9 ...
Страница 126: ...46 Fig 33 1 2 3 6 4 5 7 9 11 14 15 8 HYDRAULIKANLAGE INSTALACIÓN HIDRÁULICA 10 16 12 13 ...
Страница 129: ...49 NOTE NOTES ...
Страница 130: ...50 NOTE NOTES ...
Страница 131: ......