AG03/1
Installation English
AG03/1 · Date
23.07.2019 · Art.
No.
86426 · Mod.
status
179/19
38
Pin assignment Operating voltage: CAN, PB, S3/09
•
plug pin 4 pin.
For mating connector and cable extension accessories see chapter
PIN
Designation
1
+UB (Output stage)
2
+UB (Control)
3
GND (Output stage + control)
4
N.C.
Pin assignment Operating voltage: CAN/F, PB/F
•
plug pin 4 pin.
For mating connector and cable extension accessories see chapter
PIN
Designation
1
+UB
2
Enable
3
GND
4
N.C.
Earthing connection (PE, only ABM)
For protection against interference, the screens of the signal lines and the
power line must be connected on both sides. Potential differences cause
inadmissible currents on the screen. Apply the PE connection
1
to the
protective conductor potential below the connecting plugs (see
).
Use 6,3 mm flat connectors with short strands 2,5 mm² … 4 mm² (not in
the scope of delivery). For multiple actuators we recommend connecting
the earthing to a ground bar
1
(see
Fig. 8: Ground bar
viewing side = plug-in side
viewing side = plug-in side