Instruction Manual PhaseGuard C/ T/ HT
Customer service information
28
11026E/4
11.
Decommissioning & storage
Life threatening voltage inside the instrument:
Connecting electrical lines is extremely dangerous. Parts of the system can also be damaged.
Local regulations for electrical installations must be observed at all times.
Remove photometer without previously emptying the sample line:
The photometer can be removed from a line only when the line is completely empty. If this is
not the case, flooding and damage to equipment as well as bodily injury may occur.
The aim of decommissioning is to prepare the photometer properly for storage and to con-
serve it during storage.
WORKSTEP
REMARKS
1.
Dangerous voltage inside the instrument:
Connecting electrical lines is extremely dangerous. Parts
of the system can also be damaged. Local regulations
for electrical installations must be observed at all times.
Interrupt the power supply to the control unit and re-
move electrical connections.
2.
Remove photometer without previously emp-
tying the sample line:
The photometer can be removed from a line only when
the line is completely empty. If this is not the case,
flooding and damage to equipment as well as bodily in-
jury may occur.
Interrupt the flow rate through the sample line and then
empty it.
Remove the photometer from the sample line and clean
the sensor head.
Reference Manual
3.
Check the dry chamber of the instrument. Replace
desiccant if necessary.
Reference Manual
4.
Disassemble the control unit.
Reference Manual
5.
Make sure that all covers are closed and all locks on the
instrument and control unit are locked.
DANGER!
WARNING!
Содержание PhaseGuard C
Страница 36: ...Appendix Instruction Manual PhaseGuard C T HT 32 11026E 4 15 Appendix 15 1 Dimension sheet PhaseGuard MB...
Страница 37: ...Appendix Instruction Manual PhaseGuard C T HT 11026E 4 33 15 2 Overview of gaskets on the PhaseGuard...
Страница 38: ...Appendix Instruction Manual PhaseGuard C T HT 34 11026E 4 15 3 PhaseGuard connection diagram...