Instruction Manual PhaseGuard C/ T/ HT
Initial start-up
20
11026E/4
WORKSTEP
PROCEDURE
2.
Perform zero
calibration.
2.1: Open the “
Zero.txt
”
file.
2.2: Enter the number 1 after the “
=
” symbol.
0 for
Adjustment no
or 1 for
Adjustment yes
2.3: After entry, close the file to save the changes. Changes are
saved automatically.
The window of the removable disk disappears and then reappears in
a moment.
2.4: If the adjustment is successful, the file
Zero.OK
appears.
If the configuration is not successful, the file
Zero.ERR
appears. In
this case, repeat adjustment and check the points in the following list
one after the other:
Soiled window on the sensor head.
Reference Manual
Air bubbles in the water.
Soiled optics in the instrument.
Reference Manual
If the check was not successfully completed, contact your
country representative.
Section 10
3.
Complete
procedure.
Put the instrument in its initial state.
If malfunctions occur, please refer to the Reference Manual.
7.
Operation
The PhaseGuard can be operated with a SICON (control unit). Handling and parameteriza-
tion of the menu functions are described in detail in the Reference Manual.
Содержание PhaseGuard C
Страница 36: ...Appendix Instruction Manual PhaseGuard C T HT 32 11026E 4 15 Appendix 15 1 Dimension sheet PhaseGuard MB...
Страница 37: ...Appendix Instruction Manual PhaseGuard C T HT 11026E 4 33 15 2 Overview of gaskets on the PhaseGuard...
Страница 38: ...Appendix Instruction Manual PhaseGuard C T HT 34 11026E 4 15 3 PhaseGuard connection diagram...