Servicing
Instruction Manual PhaseGuard C/ T/ HT
11026E/4
25
8.4.
Replacing gasket of the in-line housing
and blanking plate
Danger when removing the instrument if the sample line has not been previously
emptied.
The photometer may be removed from a line only when the line is completely empty. If this
is not the case, flooding and damage to equipment as well as bodily injury may occur.
WORKSTEP
PROCEDURE
1
Empty sample line.
Ensure that the sample line is empty.
2
Put the system into a safe
state and remove the in-
strument from the line.
Danger when removing the photometer if the
sample line has not been previously emptied:
The photometer may be removed from a line only when
the line is completely empty. If this is not the case, flood-
ing and damage to equipment as well as bodily injury
may occur.
2.1: Release lock clamp that fastens the photometer.
2.2: Remove photometer from the line and replace the
old gasket (arrow) with a new gasket.
CAUTION!
Содержание PhaseGuard C
Страница 36: ...Appendix Instruction Manual PhaseGuard C T HT 32 11026E 4 15 Appendix 15 1 Dimension sheet PhaseGuard MB...
Страница 37: ...Appendix Instruction Manual PhaseGuard C T HT 11026E 4 33 15 2 Overview of gaskets on the PhaseGuard...
Страница 38: ...Appendix Instruction Manual PhaseGuard C T HT 34 11026E 4 15 3 PhaseGuard connection diagram...