2 Functions
88
6MD665 Manual
C53000-G1876-C103-3
Figure 2-39
Physical system structure (example)
Abbreviations: PCU: Process Communication Unit
SCM: Switch Control Module
DBC: Digital Breaker Control
During configuration, certain information within the relay is assigned to certain physi-
cal interfaces (e.g., binary inputs and output contacts) or logical interfaces (e.g., user-
defined logic, CFC). It must be determined which information should be linked with
which device interface. It may also be determined which properties the information
and the interfaces should have. During allocation, indications and statistical values of
previous events can be lost. Therefore, the operational indication buffer and the sta-
tistic meter should be read out before alterations are made later on.
Configuring process bus
After you have inserted a process control device into the project, you must configure it.
Proceed as follows:
Right-click the device to be configured.
Click Object properties in the context menu. The dialog box Properties - SIPROTEC
device opens. Select the Communications Modules tab.
Содержание SIPROTEC 6MD665
Страница 8: ...Preface vi 6MD665 Manual C53000 G1876 C103 3 ...
Страница 14: ...Contents vi 6MD665 Manual C53000 G1876 C103 3 ...
Страница 140: ...3 Installation and Commissioning 126 6MD665 Manual C53000 G1876 C103 3 ...
Страница 166: ...4 Technical Data 152 6MD665 Manual C53000 G1876 C103 3 ...
Страница 201: ...A 9 Group Alarms 187 6MD665 Manual C53000 G1876 C103 3 A 9 Group Alarms No Description No Description ...
Страница 210: ...Literature 196 6MD665 Manual C53000 G1876 C103 3 ...
Страница 222: ...Index 208 6MD665 Manual C53000 G1876 C103 3 ...