Connection and commissioning
5.2 Mounting and connection
Air circuit breaker 3WL10
138
Manual, 11/2017, L1V30499596002-01
Installing the guide frame
1.
Install the guide frame in the switchboard panel:
Floor mounting (For the drilling template, see Chapter Switchboard panel, hole and
drilling templates, withdrawable breaker (Page 193)):
–
Fasten the guide frame to the base of the switchboard panel with four screws M8 x 25
with a tightening torque of 21 Nm.
Содержание SENTRON 3WL10
Страница 1: ......
Страница 2: ......
Страница 8: ...Table of contents Air circuit breaker 3WL10 6 Manual 11 2017 L1V30499596002 01 ...
Страница 14: ...Introduction 1 3 Safety instructions Air circuit breaker 3WL10 12 Manual 11 2017 L1V30499596002 01 ...
Страница 21: ...Description 2 2 Possible uses and portfolio Air circuit breaker 3WL10 Manual 11 2017 L1V30499596002 01 19 ...
Страница 108: ...Accessories 3 5 Breaker Data Adapters and test devices Air circuit breaker 3WL10 106 Manual 11 2017 L1V30499596002 01 ...
Страница 128: ...Application planning 4 3 Communication planning Air circuit breaker 3WL10 126 Manual 11 2017 L1V30499596002 01 ...
Страница 152: ...Connection and commissioning 5 4 Commissioning Air circuit breaker 3WL10 150 Manual 11 2017 L1V30499596002 01 ...
Страница 170: ...Operation 6 3 Troubleshooting Air circuit breaker 3WL10 168 Manual 11 2017 L1V30499596002 01 ...
Страница 180: ...Technical specifications Air circuit breaker 3WL10 178 Manual 11 2017 L1V30499596002 01 ...
Страница 198: ...Dimension drawings 9 2 Withdrawable breaker Air circuit breaker 3WL10 196 Manual 11 2017 L1V30499596002 01 ...
Страница 199: ...Air circuit breaker 3WL10 Manual 11 2017 L1V30499596002 01 197 Circuit diagrams 10 ...
Страница 212: ...Circuit diagrams Air circuit breaker 3WL10 210 Manual 11 2017 L1V30499596002 01 ...
Страница 230: ...List of abbreviations C 1 Table of abbreviations Air circuit breaker 3WL10 228 Manual 11 2017 L1V30499596002 01 ...
Страница 233: ......
Страница 234: ......