Connection and commissioning
5.4 Commissioning
Air circuit breaker 3WL10
Manual, 11/2017, L1V30499596002-01
145
5.4
Commissioning
You can read how to operate the circuit breaker during each test point in Chapter Operation
(Page 151).
5.4.1
General tests
DANGER
Electric shock!
Test the circuit breaker only while the switchboards are de-energized.
Note
General testing of the circuit breaker is necessary in the following cases:
•
The circuit breaker is put into operation for the first time.
•
The circuit breaker is inactive for a long time and during storage under certain
environmental conditions
The tests contain the procedures that must only ever be performed by electrically skilled persons.
Electrically skilled person (IEV 195-04-01): Person with relevant education and experience to
enable him or her to perceive risks and to avoid hazards which electricity can create.
The following table describes the general testing of the circuit breaker and its installed
environment:
Items to be tested
1)
Checks
Switchboard
1. Sufficient ventilation to avoid overtemperatures
2. Clean installation location, free of all installation waste (e.g. cables,
tools, metal splinters)
3. Circuit breaker correctly mounted (tightening torques and ventilation
clearances observed)
4. The environmental conditions of the installation must match the
specifications (see Chapter Application planning (Page 107)).
Connections
1. Electrical connections at the terminals of the circuit breaker
tightened
2. Cables, busbars, and auxiliary current wiring have sufficient con-
ductor cross sections
3. Required insulation clearances between the phases (if necessary
with phase barriers) and from phases to the switchboard panel.
Operations
Perform a few open and close operations.
It must be possible to operate the lever of the operator normally and
to charge the spring energy store.
Note: If an undervoltage coil is present, the circuit breaker can only
be closed when a voltage is applied at the corresponding auxiliary
conductor terminals.
1)
If present
Содержание SENTRON 3WL10
Страница 1: ......
Страница 2: ......
Страница 8: ...Table of contents Air circuit breaker 3WL10 6 Manual 11 2017 L1V30499596002 01 ...
Страница 14: ...Introduction 1 3 Safety instructions Air circuit breaker 3WL10 12 Manual 11 2017 L1V30499596002 01 ...
Страница 21: ...Description 2 2 Possible uses and portfolio Air circuit breaker 3WL10 Manual 11 2017 L1V30499596002 01 19 ...
Страница 108: ...Accessories 3 5 Breaker Data Adapters and test devices Air circuit breaker 3WL10 106 Manual 11 2017 L1V30499596002 01 ...
Страница 128: ...Application planning 4 3 Communication planning Air circuit breaker 3WL10 126 Manual 11 2017 L1V30499596002 01 ...
Страница 152: ...Connection and commissioning 5 4 Commissioning Air circuit breaker 3WL10 150 Manual 11 2017 L1V30499596002 01 ...
Страница 170: ...Operation 6 3 Troubleshooting Air circuit breaker 3WL10 168 Manual 11 2017 L1V30499596002 01 ...
Страница 180: ...Technical specifications Air circuit breaker 3WL10 178 Manual 11 2017 L1V30499596002 01 ...
Страница 198: ...Dimension drawings 9 2 Withdrawable breaker Air circuit breaker 3WL10 196 Manual 11 2017 L1V30499596002 01 ...
Страница 199: ...Air circuit breaker 3WL10 Manual 11 2017 L1V30499596002 01 197 Circuit diagrams 10 ...
Страница 212: ...Circuit diagrams Air circuit breaker 3WL10 210 Manual 11 2017 L1V30499596002 01 ...
Страница 230: ...List of abbreviations C 1 Table of abbreviations Air circuit breaker 3WL10 228 Manual 11 2017 L1V30499596002 01 ...
Страница 233: ......
Страница 234: ......