
BA 2010
Operating Instructions, 02/2018, A5E38093846A/RS-AC
49
Commissioning
5
5.1
General information for commissioning
WARNING
Unintentional starting of the drive unit
Secure the drive unit to prevent it from being started up unintentionally.
Attach a warning notice to the start switch.
WARNING
Risk of slipping on oil
Remove any oil spillage immediately with an oil-binding agent.
NOTICE
Undershooting the minimum radial force can damage the bearings
On cylindrical-roller bearings in the input unit, undershooting the minimum radial force can
damage the bearings.
Prolonged test runs when off-load must be kept to a minimum.
5.2
Checking the oil level prior to commissioning
Check the oil level before commissioning. Correct the oil quantity when required. Note
Checking and changing lubricants (Page 59).
Siemens AG recommends a complete oil change after a storage time longer than 24 months:
●
For gearboxes with long-term preservation.
●
For gearboxes supplied completely filled with oil.
Note Checking and changing lubricants (Page 59).
Содержание MOTOX BA 2010
Страница 1: ......
Страница 2: ......
Страница 8: ...Table of contents BA 2010 6 Operating Instructions 02 2018 A5E38093846A RS AC ...
Страница 54: ...Operation BA 2010 52 Operating Instructions 02 2018 A5E38093846A RS AC ...
Страница 82: ...Disposal BA 2010 80 Operating Instructions 02 2018 A5E38093846A RS AC ...
Страница 123: ......
Страница 124: ......