
BA 5060 EN 04/2011
5.12
Oiltemperature monitoring system
The gear unit is fitted with a Pt 100 resistance thermometer for measuring the oil
temperature in the oil sump. In order to measure the temperatures and/or temperature
differences, the Pt 100 resistance thermometer, which should comply with the
requirements of Directive 94/9/EC, must be connected to a suitable evaluating
instrument provided by the customer.
For control information, refer to the list of equipment.
Observe the operating instructions relating to the device in all instances.
3
2
1
Fig. 15:
Gear unit with resistance thermometer Pt 100
1
Pt 100 resistance thermometer
2
Pressure monitor
3
Coarse filter
A detailed view of the gear unit can be obtained from the drawings in the gearunit documentation.
When operating and servicing the components, observe the operating instructions relating to
the components.
For technical data, refer to the data sheet and/or the list of equipment.
5.13
Vibration monitoring of the bearings
The gear unit has been prepared for bearing monitoring. For fitting the measuring
nipples for shockpulse transducers there are threaded bores in the vicinity of the
bearings to be monitored in the gearunit housing.
SW17
Measuring nipple
Fig. 16:
Bearing monitoring with "SPM" measuring nipples
For a detailed illustration of the gear unit and the position of the addon parts, please refer to the drawings
of the gearunit documentation.
When operating and servicing the components, observe the operating instructions relating to
the components.
For technical data, refer to the data sheet and/or the list of equipment.