55(60)
2) Move up the material colletion box as the bold arrow showd, then pull back
and make the edgefold (2) of the box hook up the edgefold (1) of the siding.
Picture 3-27
:
Installation of Material Collection Box 2
3) The after installation state of material collection box is showed in the picture
below.
Picture 3-28
:
Installation of Material Collection Box 3
4) Fasten the star knob and finish the installation. See picture below.
Picture 3-29
:
Installation of Material Collection Box 4
Содержание SG-16N Series
Страница 1: ...SG 16N 20N Series Low speed Granulator Date Sep 2017 Version Ver D English...
Страница 2: ......
Страница 8: ...8 60...