53(60)
6.6
Installation of Feed Box and Feed Port
1) Lift up the feed box to fix it onto the cutting chamber. Clean up impurities on the
contacting interface, thus use fixing rod to fix it onto the cutting chamber.
Picture 6-20: Installation of Feed Box and Feed Port 1
2) Hold the feed port, and insert it into the feed box.
Picture 6-21: Installation of Feed Box and Feed Port 2
Attention!
Lock each screw with right torque (5.9Nm).
6.7
Installation of Screen and Screen Frame
1) Put screen on to the screen frame and make its notch tallies with collar on the
screen frame.
Picture 6-22: Installation of Screen and Screen Frame 1
Содержание SG-16N Series
Страница 1: ...SG 16N 20N Series Low speed Granulator Date Sep 2017 Version Ver D English...
Страница 2: ......
Страница 8: ...8 60...