
Shindaiwa Limited
POWERCENTER 15
Four Ashes, Wolverhampton, UK
PC15-OM-Vs: 1
T: +44 (0)1902 791855
Fuel Lever
Close
Open
<Note>
Check that the surrounding area is safe before starting the engine.
When there are multiple workers who are working together, they must mutually signal
each other before starting the engine.
Do not use in an area with high temperature or humidity, or an area with a large amount of
dust.
Do not open any doors during operation. Operating with a door open can negatively affect
cooling effect, resulting in an equipment malfunction.
Use ear protection if the level of noise is high. Failure to do so could result in hearing
damage.
8-1
.
Initial start-up / Pre-check
1)
Turn all connected equipment’s switch to “OFF”
2)
Turn all breakers (3-P, 1-P and circuit protector) to "OFF".
3)
Turn the fuel lever (on the fuel strainer) to "OPEN".
4)
Check the emergency stop switch is released and terminal covers are closed.
5)
If the temperature is 5°C or less, turn the starter switch to the "PREHEAT" position
and wait until the preheat lamp turns off. (Approx. 5 seconds)
6)
Turn the starter switch to the "START" position to start the starter motor, which then
starts the engine.
7)
After the engine starts, remove your hand from the starter switch.
8)
Allow the engine to warm up for approximately 5 minutes.
9)
Turn the breakers to “ON” to start power transmission.
Terminal
Cover
(Close)
Ring Latch
(LOCK)
Bolt (M8)
Starter
Switch
Preheat Lamp
1-Phase
Breaker
3-Phase
Breaker
1-Phase
Breaker
3-Phase
Leakage Relay
-30-