
Shindaiwa Limited
POWERCENTER 15
Four Ashes, Wolverhampton, UK
PC15-OM-Vs: 1
T: +44 (0)1902 791855
Bonnet Grounding
Terminal
1-PHASE
ELCB
(Breaker)
Meter Selector
Monitor Lamp
Fuel Meter
Multi digital
Meter
Starter Switch
3-PHASE
Breaker
3-PHASE
Receptacle
(415V 32A)
1-PHASE
Receptacle
(240 32AV)
3-PHASE
ELR
(Relay)
Preheat Lamp
Emergency
Stop Switch
1-PHASE
Receptacle
(240V 16A)
1-PHASE
Receptacle
(110V 16A)
1-PHASE
Receptacle
(110V 32A)
1-PHASE
Breaker
(240V 20A)
1-PHASE
Breaker
(240V 15A)
1-PHASE
Breaker
(110V 30A)
1-PHASE
Breaker
(110V 15A)
-11-