Shindaiwa POWERCENTER 15 Скачать руководство пользователя страница 1

Shindaiwa Limited 

 

POWERCENTER 15 

Four Ashes, Wolverhampton, UK 

 

PC15-OM-Vs: 1 

T: +44 (0)1902 791855 

 

 

 

 

OPERATOR’S MANUAL 

POWERCENTER 15 

 

 

 

 

 

 

 

 

CAUTION 

Do  not  operate  the  Generator,  or  any  other  appliance,  before  you  have  read  and 
understood the instructions for use.  

 

Содержание POWERCENTER 15

Страница 1: ...CENTER 15 Four Ashes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855 OPERATOR S MANUAL POWERCENTER 15 CAUTION Do not operate the Generator or any other appliance before you have read and understood t...

Страница 2: ...Shindaiwa Limited POWERCENTER 15 Four Ashes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855...

Страница 3: ...rounding 16 5 6 Emergency Stop Switch 19 5 7 Terminal Cover Switch 19 6 Load connections 20 6 1 Load Cable Selection 20 6 2 Connecting Load Cable 21 7 Pre Operation Inspection 25 7 1 Engine Oil Inspec...

Страница 4: ...e equipment or other properties Caution Other types of caution Even some of the items noted in Caution may lead to serious injuries Please read all items and follow all the safety guidelines The follo...

Страница 5: ...es for design Risk assessment and risk reduction 2010 BS EN 60204 1 Safety of machinery Electrical equipment of machines General requirements 2006 A1 2009 BS EN 61000 6 2 Electromagnetic compatibility...

Страница 6: ...tely never perform such tasks near fire or other open flame Wait until the engine has completely cooled before inspecting fuel or refueling Always be sure to wipe up any spilled fuel or oil Spilled fu...

Страница 7: ...rator work area while Generator is being performed without the permission of a doctor The welder generates a magnetic field while energized that can negatively affect pacemaker operation Caution Suffo...

Страница 8: ...vice to an AC output receptacle The lifting lug is designed to be used only for lifting the equipment Do not lift the equipment with any heavy items such as a trailer and additional fuel tank added to...

Страница 9: ...ew labels in the specified locations Order the necessary labels by numbers in parentheses 1 Fire No X505 007650 2 Suffocation from exhaust fume No X505 007570 3 Lifting eye No X505 000240 4 Hot surfac...

Страница 10: ...Shindaiwa Limited POWERCENTER 15 Four Ashes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855 LABEL REPRODUCTION X505 007650 X505 007570 X505 000240 X505 006420 X505 006410 7...

Страница 11: ...Shindaiwa Limited POWERCENTER 15 Four Ashes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855 M707 000260 X505 007630 X505 007560 X505 004890 X505 006430 8...

Страница 12: ...L 3 6 Effective 1 7 Cooling Water Volume L 4 0 Sub Tank Capacity 0 6 L included Starting Method Starter Motor Battery 46B24L Japanese Industrial Standard Fuel Tank Capacity L 37 Dimen sion Length mm 1...

Страница 13: ...iwa Limited POWERCENTER 15 Four Ashes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855 4 Parts Operation Panel 1 Phase Breaker Cover 3 Phase Breaker Cover Circuit Breaker Cover Terminal Cover Ring Lat...

Страница 14: ...Lamp Fuel Meter Multi digital Meter Starter Switch 3 PHASE Breaker 3 PHASE Receptacle 415V 32A 1 PHASE Receptacle 240 32AV 3 PHASE ELR Relay Preheat Lamp Emergency Stop Switch 1 PHASE Receptacle 240V...

Страница 15: ...Key 1 Set Door Key 1 Set Top Plate Muffler Lifting Lug Fuel Inlet Fuel Inlet Cover Spill Containment Coolant Sub Tank Battery Air Cleaner Oil Drain Plug Side Door Fuel Lever Fuel Strainer Fuel Drain...

Страница 16: ...7 Draining Liquid from the Spill Containment Note It is necessary to periodically drain the liquid from spill containment because any rainwater induced into the equipment accumulates in the spill cont...

Страница 17: ...s Never open the radiator cap during operation or immediately after stopping the equipment Hot cooling water and steam will spurt out Always be sure to stop the engine and allow it to cool before insp...

Страница 18: ...erioration Change the engine oil periodically Refer to section 9 1 Changing the Engine Oil The charge monitor cannot detect battery deterioration or insufficient battery fluid Inspect the battery flui...

Страница 19: ...the troubles as insulation failure of the load while the generator is running and cutting off the circuit for protection against any accident such as electrical shock The sensitivity current of earth...

Страница 20: ...less ON OFF 1 100mA ON OFF 300mA ON OFF 500mA ON OFF 1000mA ON OFF Selection of Operating Time not applicable to 30mA Time setting Slide switch position Switch 5 6 7 8 0 04sec or less ON OFF 0 3sec 0...

Страница 21: ...If using a plug without a grounding pole or output terminals Connect load grounding earth on to the terminal directly as shown right Securely ground the bonnet grounding terminal to the metal frame o...

Страница 22: ...ng the emergency stop switch securely return the starter switch to the STOP position and turn the starter switch clockwise to reset the switch 5 7 Terminal Cover Switch An automatic engine stop featur...

Страница 23: ...and an allowable current for use giving consideration to the distance from the generator to the load using the generator NOTE Select proper size of cables that ensures that the voltage drop across th...

Страница 24: ...rminal or receptacles Always be sure to turn off all breakers before installing or removing devices using AC output receptacles Close the output terminal cover before use CAUTION FIRE Never directly c...

Страница 25: ...0 1902 791855 For single phase load Terminal voltage is 415 V 2 Single Phase Output Terminal and Receptacle For single phase 110 V load 3 Receptacle spec 32A 32A 32A 16A 32A 32A 16A Load Load Load Lo...

Страница 26: ...up to the kVA as shown below 1 phase 240V Use is possible up to the kVA as shown below 3 Phase 415V Output Terminal Receptacle Total 13kVA 13kVA 13kVA 1 phase 240V Output Terminal Receptacle Total R O...

Страница 27: ...shes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855 1 phase 110V Use is possible up to the kVA as shown below 1 phase 110V Output Terminal Receptacle Total U W 10 4kVA 3 3kVA 3 3kVA 1 65kVA 10 4kVA...

Страница 28: ...perform maintenance to the equipment near fire or other open flame Caution Burns The engine muffler and similar parts are extremely hot during operation and immediately after stopping the equipment Ne...

Страница 29: ...er level lower than LOW add water to both the sub tank and radiator 1 Adding Water to the Coolant Sub Tank 1 Remove the sub tank cap 2 Pour cooling water into the sub tank until it reaches the FULL le...

Страница 30: ...No 2 D in such areas Use No 1 D S15 in place of No 1 D in regions where the temperature is 10 C or less Always be sure to use the fuel strainer attached to the fuel inlet Add fuel until the tank is s...

Страница 31: ...ttention if it gets into the eyes Warning Explosion Do not operate the equipment or recharge the battery when the battery fluid level is below the lower level Do not generate any sparks near the batte...

Страница 32: ...persons locations because the engine exhaust fume includes components that are harmful to humans Caution Burns The engine muffler and similar parts are extremely hot during operation and immediately a...

Страница 33: ...ge 8 1 Initial start up Pre check 1 Turn all connected equipment s switch to OFF 2 Turn all breakers 3 P 1 P and circuit protector to OFF 3 Turn the fuel lever on the fuel strainer to OPEN 4 Check the...

Страница 34: ...roximately 10 seconds 5 After the engine starts remove your hand from the starter switch 6 Wait for air to be completely bled from the fuel pipes and engine speed to stabilize approx 1 minute Engine s...

Страница 35: ...engine does not stop by starter switch operation stop using the equipment and request repair at the retail outlet where the equipment was purchased 8 3 Emergency Stop The equipment includes an emergen...

Страница 36: ...tion when the engine is automatically stopped or an indicator lamp lights up to stop the engine Protection Feature List No Action Abnormality Breaker Trip Engine Automatic Shutdown Warning Cause 1 Mon...

Страница 37: ...using Absolutely never inspect or perform maintenance to the equipment near fire or other open flame Warning Injuries to Eyes and Skin Use protective gear such as rubber gloves when inspecting or repl...

Страница 38: ...ure that no other persons can accidentally come close to the equipment Close all doors and covers if momentarily leaving the equipment unattended Perform periodic inspection and maintenance as indicat...

Страница 39: ...uel Injection Pump 23 Clean Inspect Spill Containment Or 1years 1 Changing the Engine Oil 1st time 50 hours 2nd time and after Every 100 hours 1 Remove the oil plug 2 Remove the oil drain plug and dra...

Страница 40: ...t have a filter wrench Oil filter part no 15853 32436 Kubota part no After adding engine oil operate the engine for a short period and check that there is no oil leakage Stop the engine when completed...

Страница 41: ...oval Note Check that no foreign material is adhering to the packing then install the cup After installation turn the fuel lever to OPEN and check that there is no fuel leakage After checking turn the...

Страница 42: ...g water leakage Stop the engine when completed 7 Drain the Spill Containment Drain Pre operation 1 Set a large pans or bucket under the drain port of the spill containment to catch the liquid 2 Remove...

Страница 43: ...n installation bolts M8 of the spill containment 3 Lift up the equipment body to separate the spill containment and set the equipment on a level surface 4 Clean the inside of the spill containment usi...

Страница 44: ...the spill containment Caution Burns The engine muffler and similar parts are extremely hot during operation and immediately after stopping the equipment Never touch hot parts Always be sure to stop t...

Страница 45: ...or perform maintenance to the equipment near fire or other open flame Warning Injuries to Eyes and Skin Use protective gear such as rubber gloves when inspecting or replacing the battery due to the d...

Страница 46: ...ial is mixed in with the fuel 6 Blown fuse 1 Turn the fuel lever to OPEN 2 Add fuel 3 Release Emergency stop SW 4 Close the Terminal covers 5 Drain water from and clean the fuel tank and fuel strainer...

Страница 47: ...Shindaiwa Limited POWERCENTER 15 Four Ashes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855 12 Engine Wiring Diagram 2 44...

Страница 48: ...Shindaiwa Limited POWERCENTER 15 Four Ashes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855 13 Generator Wiring Diagram 45...

Страница 49: ...Shindaiwa Limited POWERCENTER 15 Four Ashes Wolverhampton UK PC15 OM Vs 1 T 44 0 1902 791855...

Страница 50: ...hampton UK PC15 OM Vs 1 T 44 0 1902 791855 EXCLUSIVE DISTRIBUTER FOR UK EIRE SHINDAIWA LIMITED 6 THE DELL ENETRPRISE DRIVE FOUR ASHES Wolverhampton WEST MIDLANDS WV10 7DF PHONE 01902 791855 FAX 01902...

Отзывы: