
User’s guide
HRP/D
-
15
-
HS
Operation
7.1
PREPARATION
1.
Check that the air pressure is set at
6 Bar
(see
7.8,
page
16
).
2.
Clear the working surface.
3.
Check that all the heating elements are connected to
the control units.
4.
Check that no scraps of material remain in the
reflectors.
5.
Check that all the upper heating elements and pressure
bars are firmly attached to the top frame.
6.
Turn the potentiometers in the control units to "
0
".
7.
Switch off all the control units (position "
").
8.
Turn on the main switch
A
(position
I
).
The red lamp in switch
C
will light.
The yellow lamp in switch
E
will light.
If switch
F
is set to Hand Operation, the yellow lamp in
switch
H
will light.
7.2
SWITCHING ON CONTROL UNITS
The power supply to the control units must be switched on separately.
1.
Press switch
B
.
The red lamp in switch
C
will go out.
The green lamp in switch
B
will light.
The control units are now ready for use!
7.3
SWITCHING ON TOP FRAME
The top frame is switched on separately. The safety system with the ribbon switch
must then be released.
1.
Press switch
D
.
The yellow lamp in switch
E
will go out.
The green lamp in switch
D
will light.
7
Содержание HRP/D
Страница 1: ...User s Guide English Plastic bending machine HRP D...
Страница 5: ...User s guide HRP D 4 HS Equipment 51 H Service and warranty 53...
Страница 45: ...User s guide HRP D 44 HS Annex DIAGRAM CONTROL UNIT B...
Страница 46: ...User s guide HRP D 45 HS Annex DIAGRAM TIMER UNIT C...
Страница 47: ...User s guide HRP D 46 HS Annex DIAGRAM SWITCH UNIT D...
Страница 48: ...User s guide HRP D 47 HS Annex DIAGRAM PNEUMATIC SYSTEM E...
Страница 49: ...User s guide HRP D 48 HS Annex DIMENSIONS F 1300 3390 1550 1720...