User’s guide
HRP/D
-
14
-
HS
Installation
6.1
ASSEMBLY
1.
Remove packaging and blocking of top frame.
2.
Place the machine on a level floor with sufficient space
around and above the machine.
3.
Level the working surface of the machine, using shims
under the feet if necessary.
4.
Ensure there is adequate ventilation and lighting at the
workplace.
5.
Avoid draughts, in order to prevent uneven heating.
When moving the machine with a forklift truck ensure that the
machine is supported right in the centre.
Also use sufficiently long prongs on the forklift truck.
6.2
CONNECTING COMPRESSED AIR
1.
Check that all heating elements and pressure bars in the top
frame are firmly attached.
2.
Check the air pressure in your system (max. 8 bar).
3.
Close the reducing valve on the air unit (
turn to the left
).
Unlock if necessary (
pull out
).
4.
Using a quick-action coupling connect the rear of the
machine to your compressed air system or compressor.
5.
Slowly open the reducing valve (
turn to the right
) and set
the air pressure in the system at
6 bar
.
6.3
CONNECTING POWER CABLE
1.
Check that the rating of the electrical system is adequate (see technical data).
2.
Check that the main switch
A
is in the
-position.
3.
Plug in the machine.
6.4
CONNECTING FOOT SWITCH
1.
Insert the plug of the foot switch into the connection on
the side of the machine. The plug will click into place.
N.B. To remove the foot switch the small stop above the
plug must be pressed.
6
Содержание HRP/D
Страница 1: ...User s Guide English Plastic bending machine HRP D...
Страница 5: ...User s guide HRP D 4 HS Equipment 51 H Service and warranty 53...
Страница 45: ...User s guide HRP D 44 HS Annex DIAGRAM CONTROL UNIT B...
Страница 46: ...User s guide HRP D 45 HS Annex DIAGRAM TIMER UNIT C...
Страница 47: ...User s guide HRP D 46 HS Annex DIAGRAM SWITCH UNIT D...
Страница 48: ...User s guide HRP D 47 HS Annex DIAGRAM PNEUMATIC SYSTEM E...
Страница 49: ...User s guide HRP D 48 HS Annex DIMENSIONS F 1300 3390 1550 1720...