33
4 TEMPERATURE
CALIBRATIONS
1. From the main screen select “Calibrate”.
2. Scroll down to “Temp” and select.
3. Place a temperature-measuring device, an electronic RTD or laboratory grade thermometer, in
the mixing chamber and allow reading to stabilise.
4. When reading has stabilised, select “Ready”.
5. Using the arrow keys enter the measured temperature and press the return key.
6. The temperature is now calibrated, return to main screen.
Calibrate 06:26 7/20/01
mg/l Free Cl
Calibrate zero or low
Calibrate pH - first solution
Set pH slope - second solution
1.036
pH1
pH2
2
Select
Cell Temperature
Temp
Low
Calibrate Temperature 08:27 7/20/01
mg/l Free Cl
Current Value
Press to Cancel
1.036
61.11
2
Ready
°F
Calibrating 08:28 7/20/01
mg/l Free Cl
Old Value 61.11
New Value
Cell Temperature
1.039
6 1 . 1 1
2
Restore
Содержание Capital Controls CI1000B
Страница 9: ...9 Figure 4 Flow Cell Assembly The sample tap assembly fig 4 19 is an optional extra...
Страница 16: ...16 Figure 11 Wiring Diagram...
Страница 45: ...45...