General information for the installer
7
Current regulations require the heating installation to
be inspected before it is commissioned. The inspec-
tion must be carried out by a suitably qualified person
and should be documented. The above applies to
closed heating systems. If the heat pump is replaced,
the installation must be inspected again.
AWA-SS series is placed on a firm base, preferably a
concrete floor or foundation. Install AWA-SS series
with its back to an outside wall, ideally in a room where
noise does not matter. If this is not possible, avoid
placing it against a wall behind a bedroom or other
room where noise may be a problem. Any wall that
backs on to a bedroom should be fitted with sound
insulation. Route pipes so they are not fixed to an inter-
nal wall that backs on to a bedroom or living room.
Installation
Copper pipe connecting
Inspection of the installation
1) The maximun length of the connecting copper pipe
between the mainframe and outdoor unit is 15 meters.
+2
0
-2
1
R
0
H M flo w
4 9 (5 0 )
°C
H o t w
a
te r5 1
°C
+2
0
-2
1
R
0
HM
f
lo
w49
(
5
0
)
°C
Ho
t w
a
te
r
51
°C
The AWA-SS series must be transported and stored
upright and dry. The AWA-SS series may however be
carefully laid on its back when being moved into
a building.
Transport and storage
2) There is no need to charge extra refrigerant into the
copper pipe while its length is less than 5 meters.
3) While the copper length is more than 5 meters,
copper pipe while its length is less than 5 meters.every
extra 10g refrigerant must be charged for per increased
1 meter length.
Содержание AWA-SS-10
Страница 2: ......
Страница 21: ...Electrical connection 19 Wiring Diagram 230V 50 HZ ...
Страница 22: ...Electrical connection 20 Wiring Diagram 3X400V 3 50 HZ ...
Страница 46: ...44 1 11 3 2 4 5 6 7 9 10 12 13 14 8 9 Component placement Please Note The picture for reference only ...
Страница 48: ...Component placement 3X400 V 3 50 HZ 230 V 50 HZ 70 71 70 71 46 Please Note The picture for reference only ...