Dealing with malfunctions
43
FIGHTER 1220
Close the shut-off valves in heating medium system.
open the drain valve (73 , 74). A small amount of
water runs out, however, to fully empty the heating
medium side requires the connector that joins the
heating medium side and the connection on the heat
pump VB-flow to be loosened a little to allow air to
enter so the remaining water can run out. When the
heating medium is empty the requisite service can be
carried out.
Draining, heat medium side
If the operating disturbance cannot be rectified by means of the above,
an installation engineer should be called.
First,close the drain valve (73,74). And then open the
drain valve ( 72 ). When the water tank is empty the
requisite service can be carried out.
Draining, water tank
The drain-pipe for the chassis is already assembled in
advance before leaving the factory. The consumer is
required to place the hose at appropriate location.
Draining, the chassis
75
76
And then close the water tank drain valve (72) . and
72
44
74
73
Содержание AWA-SS-10
Страница 2: ......
Страница 21: ...Electrical connection 19 Wiring Diagram 230V 50 HZ ...
Страница 22: ...Electrical connection 20 Wiring Diagram 3X400V 3 50 HZ ...
Страница 46: ...44 1 11 3 2 4 5 6 7 9 10 12 13 14 8 9 Component placement Please Note The picture for reference only ...
Страница 48: ...Component placement 3X400 V 3 50 HZ 230 V 50 HZ 70 71 70 71 46 Please Note The picture for reference only ...