l
F.8L Falco Construction Manual
27–18
Revision 4, March 1, 2002
Figure 31
❏
Locate the center of the battery hold-down bolts. The hardware is included in the
electrical kit. The battery is held down with two 1/4” bolts which are installed with a P/N
846 single-bolt channel-nut. The channel-nuts are installed under the floor with a 15mm-
thick spruce block. The bolts come up through the floor on each side of the battery. A
nylon bar is installed over the bolts and battery and is held in place with wing nuts. The
nylon hold-down bar has the 1/4”Ø holes drilled at 10.13” between centers for the Gill
PS6-11 and 8.05” between centers for the Gel/Cell battery. Until you have the battery,
you will not be able to exactly locate the B.L. position of the holes. See Figure 31.
❏
Draw these same lines on the bottom of the floorboard.
Figure 32
❏
Use 15x15 spruce strips and install a “picture frame” for the battery as shown in Figure 32.
❏
Install a 15x15 spruce strip along the centerline of the aircraft. See Figure 32.
Содержание F.8L Falco
Страница 1: ...F 8L Falco Construction Manual...
Страница 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Страница 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Страница 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Страница 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Страница 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Страница 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Страница 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Страница 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Страница 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Страница 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Страница 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Страница 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Страница 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...